- Home
- KEMET Support Center
- Transit Time by Plant Code
Transit Time by Plant Code
Transit Time by Plant Code
When quoting lead time, use KEMET ship date and simply add the following transit times. Plant and shipping methods are subject to change.
Note: Transit times represented on this page may vary due to COVID-19 restrictions and logistic changes.
Americas
Plant Code | Description | Country | Shipping Method to Americas | In-transit Estimated Dock |
ANT | Anting-Shanghai Arcotronics | China | Ocean | 8 weeks |
BTM | Batam Film and Electrolytic Manufacturing | Indonesia | Ocean | 7 weeks |
CHR | Monterrey Ceramic High-Reliability Manufacturing | Mexico | Truck | 7 days |
COL | Matamoros Tantalum Molded Axial Manufacturing | Mexico | Truck | 7 days |
EVE | Evora Electrolytic Manufacturing | Portugal | Ocean | 5 weeks |
EW6 | KEMET Hub Americas (Dallas) | USA | Truck / Air | 5 days/ 3 days |
FIF | Monterrey Surface Mount Manufacturing | Mexico | Truck | 10 days |
GV1 | Tantalum High Reliability/Military Manufacturing | Mexico | Truck | 7 days |
GV2 | Tantalum/Aluminum SMD Manufacturing | Mexico | Truck | 7 days |
ICT | Tantalum Innovation Center | USA | Truck | 7 days |
JP/KR/TH | TOKIN Manufacturing | Various | Various | 10 days |
KSA | Suzhou Aluminum AO-CAP (A700) Manufacturing | China | Air | 2 weeks |
KST | Suzhou Tantalum Manufacturing | China | Air | 2 weeks |
KYU | Kyustendil Film and Electrolytic Manufacturing | Bulgaria | Ocean | 5 weeks |
MA2 | Ceramic Commercial Molded Manufacturing | Mexico | Truck | 7 days |
MA4 | Monterrey Ceramic Aximax/Goldmax Manufacturing | Mexico | Truck | 7 days |
MCD | Skopje Film and Electrolytic Manufacturing | Macedonia | Ocean | 5 weeks |
MGG | Matamoros Tantalum Commercial Can/Dipped and Molded Radial Manufacturing | Mexico | Truck | 7 days |
MNG | Pontecchio/KEMET Electronics Italia S.R.L. | Italy | Ocean | 5 weeks |
SAS | Pontecchio/KEMET Electronics Italia S.R.L. | Italy | Ocean | 5 weeks |
SBU | Ceramic Military Molded Manufacturing | Mexico | Truck | 7 days |
SCF | Suzhou Film and Electrolytic Manufacturing | China | Ocean | 8 weeks |
SSM | Suomussalmi Film and Electrolytic Manufacturing | Finland | Ocean | 5 weeks |
VER | Pontecchio/KEMET Electronics Italia S.R.L. | Italy | Ocean | 5 weeks |
VIC | Victoria Tantalum Manufacturing | Mexico | Truck | 7 days |
WGT | Monterrey, Mexico Bldg. 1 | Mexico | Truck | 7 days |
EMEA
Plant Code | Description | Country | Shipping Method to EMEA | In-transit Estimated Dock |
ANT | Anting-Shanghai Arcotronics | China | Ocean | 50 days |
BTM | Batam Film and Electrolytic Manufacturing | Indonesia | Ocean | 45 days |
CHR | Monterrey Ceramic High-Reliability Manufacturing | Mexico | Air | 5/10 days |
COL | Matamoros Tantalum Molded Axial Manufacturing | Mexico | Air | 5/10 days |
EVE | Evora Electrolytic Manufacturing | Portugal | Truck | 5/10 days |
EW8/9 | KEMET Hub EMEA (Stenovice) | Czech Republic | Truck | 3/4/5/6 days |
FIF | Monterrey Surface Mount Manufacturing | Mexico | Air | 5/10 days |
GV1 | Tantalum High Reliability/Military Manufacturing | Mexico | Air | 5/10 days |
GV2 | Tantalum/Aluminum SMD Manufacturing | Mexico | Air | 5/10 days |
ICT | Tantalum Innovation Center | USA | Air | 5/10 days |
JP/KR/TH | TOKIN Manufacturing | Various | Ocean/Air | 50 days /15 days |
KSA | Suzhou Aluminum AO-CAP (A700) Manufacturing | China | Air | 5/10 days |
KST | Suzhou Tantalum Manufacturing | China | Air | 5/10 days |
KYU | Kyustendil Film and Electrolytic Manufacturing | Bulgaria | Truck | 5/10 days |
MA2 | Ceramic Commercial Molded Manufacturing | Mexico | Air | 5/10 days |
MA4 | Monterrey Ceramic Aximax/Goldmax Manufacturing | Mexico | Air | 5/10 days |
MCD | Skopje Film and Electrolytic Manufacturing | Macedonia | Truck | 5/10 days |
MGG | Matamoros Tantalum Commercial Can/Dipped and Molded Radial Manufacturing | Mexico | Air | 5/10 days |
MNG | Pontecchio/KEMET Electronics Italia S.R.L. | Italy | Truck | 5/10 days |
SAS | Pontecchio/KEMET Electronics Italia S.R.L. | Italy | Truck | 5/10 days |
SBU | Ceramic Military Molded Manufacturing | Mexico | Air | 5/10 days |
SCF | Suzhou Film and Electrolytic Manufacturing | China | Air | 5/10 days |
SSM | Suomussalmi Film and Electrolytic Manufacturing | Finland | Truck | 5/10 days |
VER | Pontecchio/KEMET Electronics Italia S.R.L. | Italy | Truck | 5/10 days |
VIC | Victoria Tantalum Manufacturing | Mexico | Air | 5/10 days |
WGT | Monterrey, Mexico Bldg. 1 | Mexico | Air | 5/10 days |
APAC
Plant Code | Description | Country | Shipping Method to APAC | In-transit Estimated Dock |
AHK | KEMET Hub APAC Hong Kong) | Hong Kong | Air/Courier | 1-7 days |
ANT | Anting-Shanghai Arcotronics | China | Truck | 3-4 days |
BTM | Batam Film and Electrolytic Manufacturing | Indonesia | Sea | 7-12 days |
CHR | Monterrey Ceramic High-Reliability Manufacturing | Mexico | Air | 3-8 days |
COL | Matamoros Tantalum Molded Axial Manufacturing | Mexico | Air | 3-8 days |
EVE | Evora Electrolytic Manufacturing | Portugal | Sea | 45-50 days |
FIF | Monterrey Surface Mount Manufacturing | Mexico | Air | 3-8 days |
GV1 | Tantalum High Reliability/Military Manufacturing | Mexico | Air | 3-8 days |
GV2 | Tantalum/Aluminum SMD Manufacturing | Mexico | Air | 3-8 days |
ICT | Tantalum Innovation Center | USA | Air | 3-8 days |
JP/KR/TH | TOKIN Manufacturing | Various | Sea/Air/Courier | 1-7 days |
KSA | Suzhou Aluminum AO-CAP (A700) Manufacturing | China | Truck | 3-4 days |
KST | Suzhou Tantalum Manufacturing | China | Truck | 3-4 days |
KYU | Kyustendil Film and Electrolytic Manufacturing | Bulgaria | Sea | 45-50 days |
MA2 | Ceramic Commercial Molded Manufacturing | Mexico | Air | 3-8 days |
MA4 | Monterrey Ceramic Aximax/Goldmax Manufacturing | Mexico | Air | 3-8 days |
MCD | Skopje Film and Electrolytic Manufacturing | Macedonia | Sea | 45-50 days |
MGG | Matamoros Tantalum Commercial Can/Dipped and Molded Radial Manufacturing | Mexico | Air | 3-8 days |
MNG | Pontecchio/KEMET Electronics Italia S.R.L. | Italy | Sea | 45-50 days |
SAS | Pontecchio/KEMET Electronics Italia S.R.L. | Italy | Sea | 45-50 days |
SBU | Ceramic Military Molded Manufacturing | Mexico | Air | 3-8 days |
SCF | Suzhou Film and Electrolytic Manufacturing | China | Truck | 3-4 days |
SSM | Suomussalmi Film and Electrolytic Manufacturing | Finland | Sea | 45-50 days |
VER | Pontecchio/KEMET Electronics Italia S.R.L. | Italy | Sea | 45-50 days |
VIC | Victoria Tantalum Manufacturing | Mexico | Air | 3-8 days |
WGT | Monterrey, Mexico Bldg. 1 | Mexico | Air | 3-8 days |